Control Room Design

Applying our experience in systems-level thinking, together with detailed knowledge of control systems and instrumentation, we can help assess and improve the design of your control rooms. With a close relationship with EEMUA, we run Control Room Design training courses together with dedicated consultancy.

How Does it Work?

The role of the Control Room Operator in managing risks of modern process plant is indisputable. Detecting deviations early, diagnosing the causes reliably and responding promptly and appropriately all contribute to the avoidance of major accidents and reduces reliance on automated systems. To do this, Control Room Operators need to maintain good situational awareness. Their ability to perform this critical role will depend on them being healthy and alert.

Control room design can have a big influence on the ability of the Control Room Operators to perform their role effectively. In particular:

•A good quality HMI can ensure they have the data they need in a useful format;•The working environment can affect health and alertness;•Physical design and provision of equipment can support effective communication.• Our two day course introduces the up to date guidance on control room design for those engaged in reviewing existing control rooms or designing new or modified control rooms.

Control Room Ergonomic Study

Beyond training, we can support designers with the planning and optimisation of their Control Room through consultancy. We offer a Control Room Ergonomic Study which can typically evaluate existing control rooms against the new EEMUA 201 guide. Typically we would consider;

•Physical arrangement of the Control Room, console desks and equipment;•Human Machine Interface (HMI) provided by the control system;•Communication links with other members of the team and users of the control room;•Providing general working environment to operators for healthy concentration on their job.

This is something every COMAH site should do so they can demonstrate a robust human factors risk mitigation philosophy.

Enquiry Form

 

Related Training

 

 

Related Projects

 

Related Resources

Simplify the compliance of safety critical systems to IEC 61508 / 61511

Watch the Webinar Series: Control Systems FuSa Compliance using Medini for HAZOP & LOPA...

On-Demand Webinar: ARM for Defence Standards

Gain a deeper understanding of defence standards & a better way of handling dependability data....

Brochure: Ansys medini analyze

Brochure: Ansys medini analyze...

Datasheet: Ansys medini analyze

Datasheet: Ansys medini analyze...

Datasheet: Ansys medini analyze for Semiconductors

Datasheet: Ansys medini analyze for Semiconductors....

White Paper: Analysis and Development of Safety-Critical Embedded Systems: The Need for an Integrated Toolkit

White Paper: Analysis and Development of Safety-Critical Embedded Systems: The Need for an Integrated Toolkit...

White Paper: Chipping Away at Functional Safety Flaws in Automotive Electronics

White Paper: Chipping Away at Functional Safety Flaws in Automotive Electronics...

Reliability Analysis on Flow Control Products

Wilde supported the ARM requirements activity by providing detailed Reliability Analysis...

Integrating Reliability Engineering Tools into Businesses

Integrating Reliability Engineering Tools into Businesses – Some Lessons Learned...

Webinar Recording: What's New in ReliaSoft 2021

Learn about major enhancements and new functionality introduced in ReliaSoft 2021...

Certificate of Reliability and Functional Safety

Wilde's Associate, Technis has awarded a SIL 2 certificate for an ES Series Axial Flow Valve System for Oxford Flow...

Webinar Recording: Implementing the New AIAG-VDA FMEA Handbook using ReliaSoft XFMEA

Learn how ReliaSoft XFMEA software has been updated to fully support the DFMEA & PFMEA approaches according to the new...

RAMS Analysis using ReliaSoft Synthesis

Wilde performed an analysis that assesses the CWS against their client’s Reliability, Availability, Maintainability &...

Webinar Recording: What's New in ReliaSoft 2020

Learn about major enhancements and new functionality introduced in ReliaSoft 2020...

Implementing a Safety File to Meet HSE Requirements for SSE at Smurfit-Kappa

Safety Files are important to ensure that both an organisation’s corporate image and compliance with the Health and...

EEMUA Publication 201 Control rooms: a guide to their specification, design, commissioning and operation

Third edition of EEMUA 201, produced in response to changes in technology & good practice across industry....

White Paper: Alarms Management - Priority, Floods, Tears or Gain?

Alarm systems are a major tool allowing process operators to identify escalating abnormal situations and take action to...

Reliability Analysis on Flow Control Products

Wilde supported the ARM requirements activity by providing detailed Reliability Analysis...

EEMUA Publication 191 Alarm Systems - a guide to design, management and procurement

The globally accepted and leading guide to good practice for all aspects of alarm systems....

Human Factors Result in Alarms & Trips Failing to Achieve Expected Risk Reduction

Human factors in the energy & process industries that result in alarms & trips failing to achieve the expected risk...

Reducing Product Development Risk with Reliability Engineering Methods

Reduce risk in a typical product development lifecycle involving both plastic and metallic components....